Georgia construction law compendium prepared byGeorgia construction law compendium prepared by
Wei's loan indebtedness. During that time, wei could not access the construction payments B&G had been making into wei s account in order to pay its subcontractors. As such, B&G paid all of wei's subcontractors individually
66.01 Kb. 1
read
Section 15010, Mechanical Provisions (1) Related DocumentsSection 15010, Mechanical Provisions (1) Related Documents
A. Contract requirements of Division 1 Specification Sections, apply to work of this section
0.53 Mb. 9
read
Cargo arrival deadlinesCargo arrival deadlines
Consignment instructions for all airway bills, ocean bills of lading and commercial invoices
51.35 Kb. 1
read
2006 Storms Special Report2006 Storms Special Report
Two separate storms July 19 and July 21 plunged much of the St. Louis area into darkness. For some, the outages lasted a week or more
Report 68.08 Kb. 1
read
Contractors Rules & RegulationsContractors Rules & Regulations
A minimum of five (5) days prior to starting construction, the contractor shall contact the landlord's property manager to arrange a Pre-Construction Meeting at the site
196.27 Kb. 2
read
Engineering specificationsEngineering specifications
Clean Agent Fire Extinguishing utilizing hfc-227ea or branded fm200 agent manufactured by Dupont ™ at 360 psi with the mx-320 Intelligent Addressable Fire Alarm System
99.73 Kb. 1
read
Control system engineering specificationsControl system engineering specifications
Total Flood” Clean Agent Fire Suppression System with automatic detection and control. The work described in this specification includes all engineering, labor, materials, equipment and services necessary, and required
86.08 Kb. 1
read
Specification section 16710 multimedia systemsSpecification section 16710 multimedia systems
Index – List all primary headers and subheadings 01, 03, etc with titles and pages
109.26 Kb. 1
read
Introduction to repair and maintenance obligations in leasesIntroduction to repair and maintenance obligations in leases
In general, a Landlord wants to limit its maintenance and repair obligations in a lease to structure, foundation, roof and Common Areas and the Landlord wants to be able to pass through any costs incurred to maintain
16.71 Kb. 1
read

  1




The database is protected by copyright ©ininet.org 2024
send message

    Main page